Quote
Request a quote
Tell me briefly what needs building. You get one fixed amount back instead of an hourly rate and a hedge, within two working days, and it commits you to nothing.
Your project
What needs building?
Two minutes to fill in. The more concrete you are the sharper the amount that comes back, but anything marked optional can stay empty.
Sent.
Your plan and your price land within two working days.
Not there yet? Let me look at your current site for free first. Request a free audit.
After that
What happens after you hit send
- I read it and email you the questions I still need answered. Usually two or three of them.
- Within two working days you get a plan: what gets built, which pages are in it, and what each part is meant to achieve.
- Under that plan sits one fixed amount, broken out per part, so you can see where it comes from. No hourly rate and no true-up at the end.
- If you agree, the delivery time starts at the first payment. If you say no, it has cost you nothing.
Frequently asked
Questions about the quote
Am I committed to anything by requesting a quote?
No. Requesting a quote costs nothing and commits you to nothing. You get a plan and an amount, and then you decide. If you say no you do not hear from me again, because I do not chase people who have already answered.
I do not have a website yet. Can I still request a quote?
Yes, and that is half the requests that come in. The field for your current website is optional for exactly that reason. Say what your business does and what the site needs to achieve, and that is enough to base a plan and a price on.
I do not know which package I need. What do I pick?
Pick whatever comes closest, or pick Something else. The package in the form is a starting point, not a choice you are locked into. If your answers show that something else fits better, that is what the plan says, with the reason next to it.
Do I have to fill in my budget?
No, the field is optional and defaults to not sure yet. It is also not used to inflate the price: the rates are published on the site and do not change per client. All it does is tell me how large the proposal is allowed to get before it stops being realistic.
Why can I not select some of the budgets?
Because they sit below the floor of the package you picked. Grow starts at 900 euro, so the 450 to 900 range cannot pay for it. Pick a lower package and the range opens up again straight away.
Can the amount still change afterwards?
Not on its own. The amount in the quote is the amount you pay, even when the work takes me longer than I expected. It only changes if you ask for something along the way that was not in it, and you get a price for that before it gets built.
How quickly do I get an answer?
Within two working days. Usually sooner, and if I need to know something along the way you get that by email the same day rather than hearing nothing.
Ready to request your quote?
The form above takes two minutes. You get back a plan and one fixed amount, within two working days.
